Publication: Building Design, issue 1669
Publication Date: 18th November 2005
Article Title: How we cracked it.
Article content: “The studios are a response to a homeowners’ demand for additional living or work space without the inconvenience of building a traditional house extension.” The challenge: To reduce on site build time for fast–track prefab studios The solution: Devise an adjustable bearing to support the floor.”